Home < Vision Point < Detailed Account Posting from AP (DA9B)
Detailed Account Posting from AP
|
If the programs are previously unmodified and the same versions, these new programs may just be copied over. As with all modifications, it is recommended that the ACCPAC versions be checked to assure they are the same. Programs that have been modified are distributed in the same manner as described in the ACCPAC Installation Guide. Programs beginning with "TO", "T0", and "P0" should be treated the same as "SYS" files in ACCPAC, and should be located in the same directory as "SYSDATA.DBF". If there are any databases on the distribution disk that begin with "TO" they should also be located in the system directory. Please refer to the installation instructions. The TOINST program will normally rename and locate programs as required, but some files may need to be moved depending on the individual system configuration. No Documentation is required. All functions are the same with one exception. Before closing AP the data MUST BE RELEASED! It is not necessary to update GL but the data must be released from AP. If an account should not be updated in detail, change the new SUMMLINK field in GLACNTnn to Y. If the field is anything other than Y it will post the detailed entries. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Program and Form Changes:
|
The following programs and forms have either been changed or added:
Database
Changes Detailed Link
File Tags: BATCH
GLACNTnn.DBF Chart of Accounts File Tags:
|
Integrated
Business Solutions
P:619-462-7797
F:619-462-7698
4177 Yale Avenue - La Mesa, CA 91941-7717
www.ibsweb.com